Erik Jacobson
Director
Regulatory Relations

Pacific Gas and Electric Company
77 Beale St., Mail Code B13U
P.O. Box 770000
San Francisco, CA 94177
Facsimile: (415) 973-3582

January 14, 2021

Advice 6004-E-D
(Pacific Gas and Electric Company ID U 39 E)

Public Utilities Commission of the State of California
Subject:

Fourth Supplemental: 2021 Annual Electric True-Up – Consolidated
Electric Rate Changes Effective January 1, 2021

Pacific Gas and Electric Company (PG&E) submits this fourth supplemental to revise the
Total Energy Charge Rate ($ per kWh) value presented on Sheet 9 of Electric Schedule
LS-2 for rate changes effective January 1, 2021. This correction does not impact the rate
values implemented in PG&E’s billing systems effective January 1, 2021.
This supplemental advice letter supersedes Advice 6004-E-C in part to replace Sheet 9
of the Electric Schedule LS-2 tariff. The remaining tariff revisions contained in Advice
6004-E-C remain unchanged.
Purpose
The purpose of this advice letter is to supplement Advice 6004-E-C to replace Sheet 9 of
Electric Schedule LS-2.
Upon submitting Advice 6004-E-C, PG&E determined that the Total Energy Charge Rate
($ per kWh) value of Electric Schedule LS-2 was inadvertently not updated and
erroneously remained at the previous rate value of $0.18755. In this supplemental advice
letter, PG&E has corrected the Total Energy Charge Rate ($ per kWh) value to $0.18371,
effective January 1, 2021.
This correction only impacts the rate value presented on Sheet 9 of Electric Schedule LS2. The rates implemented in PG&E’s billing systems effective January 1, 2021 are not
impacted.
Tariff Revisions
PG&E submits a revised Sheet 9 of Electric Schedule LS-2 in Attachment 1 of this advice
letter.





- Page 1 -

Advice 6004-E-D -2- January 14, 2021 Protests Pursuant to CPUC General Order 96-B, Section 7.5.1, PG&E hereby requests the protest period be waived. Effective Date PG&E respectfully requests that this Tier 1 advice letter be effective on January 1, 2021, concurrent with Advice 6004-E-C. Notice In accordance with General Order 96-B, Section IV, a copy of this advice letter is being sent electronically and via U.S. mail to parties shown on the attached list and the service lists R.19-07-017, A.20-02-004, A.18-03-015, A.19-09-012, A.20-02-003, A.19-11-003, A.20-07-002, A.18-12-009, A.19-04-015, A.18-03-001, R.14-07-002, R.15-03-010, A.1704-028, A.16-08-006, A.12-08-007, A.17-01-022, A.17-01-012, R.12-11-005, R.12-01005, A.18-12-008, R.12-06-013, R.17-06-026, A.20-09-014, A.17-01-015, A.14-01-007, and A.16-06-013. Address changes to the General Order 96-B service list should be directed to email PGETariffs@pge.com. For changes to any other service list, please contact the Commission’s Process Office at (415) 703-2021 or at Process_Office@cpuc.ca.gov. Send all electronic approvals to PGETariffs@pge.com. Advice letter submittals can also be accessed electronically at: http://www.pge.com/tariffs. /S/ Erik Jacobson Director, Regulatory Relations Attachments: • Attachment 1 – Tariffs (Sheet 9 of Electric Schedule LS-2) cc: Service Lists for: R.19-07-017 (Wildfire Fund Charge) A.20-02-004 (WEMA) A.18-03-015, (2018 CEMA) A.19-09-012 (2019 CEMA) A.20-02-003 (Interim Rate Relief) A.19-11-003 (CARE/FERA Admin) A.20-07-002 (2021 ERRA Forecast) A.18-12-009 (2020 GRC Phase I) A.19-04-015 (2020 Cost of Capital) A.18-03-001 (2018 Energy Storage)
- Page 2 -

Advice 6004-E-D R.14-07-002 R.15-03-010 A.17-04-028 A.16-08-006 A.12-08-007 A.17-01-022 A.17-01-012 R.12-11-005 R.12-01-005 A.18-12-008 R.12-06-013 R.17-06-026 A.20-09-014 A.17-01-015 A.14-01-007 A.16-06-013 -3- (NEM) (SJVDAC) (EPIC) (DCCP Retirement) (SWMEO) (SB350) (Demand Response) (DG/SGIP/CSI) (ESPI) (2018 NDCTP) (Res Rate OIR) (PCIA OIR) (PUBA Trigger Application) (2018-2025 EE) (Green Option) (GRC Phase II) January 14, 2021
- Page 3 -

ADVICE LETTER SUMMARY ENERGY UTILITY MUST BE COMPLETED BY UTILITY (Attach additional pages as needed) Company name/CPUC Utility No.: Pacific Gas and Electric Company (ID U39E) Utility type: ELC GAS PLC HEAT ELC = Electric PLC = Pipeline WATER Contact Person: Kimberly Loo Phone #: (415)973-4587 E-mail: PGETariffs@pge.com E-mail Disposition Notice to: KELM@pge.com EXPLANATION OF UTILITY TYPE GAS = Gas WATER = Water HEAT = Heat (Date Submitted / Received Stamp by CPUC) Tier Designation: 1 Advice Letter (AL) #: 6004-E-D Subject of AL: Fourth Supplemental: 2021 Annual Electric True-Up - Consolidated Electric Rate Changes Effective January 1, 2021 Keywords (choose from CPUC listing): Compliance, Balancing Accounts AL Type: Monthly Quarterly Annual One-Time Other: If AL submitted in compliance with a Commission order, indicate relevant Decision/Resolution #: Does AL replace a withdrawn or rejected AL? If so, identify the prior AL: No Summarize differences between the AL and the prior withdrawn or rejected AL: Confidential treatment requested? Yes No If yes, specification of confidential information: Confidential information will be made available to appropriate parties who execute a nondisclosure agreement. Name and contact information to request nondisclosure agreement/ access to confidential information: Resolution required? Yes No Requested effective date: 1/1/21 No. of tariff sheets: 3 Estimated system annual revenue effect (%): 3.6% Estimated system average rate effect (%): 0.13% (average bundled rate impact) When rates are affected by AL, include attachment in AL showing average rate effects on customer classes (residential, small commercial, large C/I, agricultural, lighting). Tariff schedules affected: See Attachment 1 Service affected and changes proposed1: N/A Pending advice letters that revise the same tariff sheets: N/A 1 Discuss in AL if more space is needed. Clear Form
- Page 4 -

Protests and all other correspondence regarding this AL are due no later than 20 days after the date of this submittal, unless otherwise authorized by the Commission, and shall be sent to: CPUC, Energy Division Attention: Tariff Unit 505 Van Ness Avenue San Francisco, CA 94102 Email: EDTariffUnit@cpuc.ca.gov Name: Erik Jacobson, c/o Megan Lawson Title: Director, Regulatory Relations Utility Name: Pacific Gas and Electric Company Address: 77 Beale Street, Mail Code B13U City: San Francisco, CA 94177 Zip: 94177 State: California Telephone (xxx) xxx-xxxx: (415)973-2093 Facsimile (xxx) xxx-xxxx: (415)973-3582 Email: PGETariffs@pge.com Name: Title: Utility Name: Address: City: State: District of Columbia Telephone (xxx) xxx-xxxx: Facsimile (xxx) xxx-xxxx: Email: Zip: Clear Form
- Page 5 -

Attachment 1 Advice 6004-E-D Cal P.U.C. Sheet No. Title of Sheet Cancelling Cal P.U.C. Sheet No. 48296-E ELECTRIC SCHEDULE LS-2 CUSTOMER-OWNED STREET AND HIGHWAY LIGHTING Sheet 9 48241-E 48297-E ELECTRIC TABLE OF CONTENTS Sheet 1 48261-E 48298-E ELECTRIC TABLE OF CONTENTS Sheet 5 48265-E Page 1 of 1
- Page 6 -

Cancelling U 39 Revised Revised Cal. P.U.C. Sheet No. Cal. P.U.C. Sheet No. 48296-E 48241-E San Francisco, California ELECTRIC SCHEDULE LS-2 CUSTOMER-OWNED STREET AND HIGHWAY LIGHTING Sheet 9 RATES: (Cont’d.) TOTAL ENERGY RATES Total Energy Charge Rate ($ per kWh) $0.18371 (R) UNBUNDLING OF TOTAL ENERGY CHARGES The total energy charge is unbundled according to the component rates shown below. Energy Rate by Components ($ per kWh) Generation Distribution** Transmission* Transmission Rate Adjustments* Reliability Services* Public Purpose Programs Nuclear Decommissioning Competition Transition Charge Energy Cost Recovery Amount Wildfire Fund Charge New System Generation Charge** $0.08931 $0.05370 $0.02377 $0.00294 $0.00011 $0.00382 $0.00093 $0.00003 $0.00032 $0.00580 $0.00298 (R) (I) (I) (R) (I) (R) (R) (R) (I) (R) _______________ * ** Transmission, Transmission Rate Adjustments, and Reliability Service charges are combined for presentation on customer bills. Distribution and New System Generation Charges are combined for presentation on customer bills. (Continued) Advice Decision 6004-E-D Issued by Robert S. Kenney Vice President, Regulatory Affairs Submitted Effective Resolution January 14, 2021 January 1, 2021
- Page 7 -

Revised Cancelling Revised U 39 Cal. P.U.C. Sheet No. Cal. P.U.C. Sheet No. 48297-E 48261-E San Francisco, California ELECTRIC TABLE OF CONTENTS Sheet 1 TABLE OF CONTENTS SCHEDULE CAL P.U.C. SHEET NO. TITLE OF SHEET Title Page ..............................................................................................................48297-E Rate Schedules .........................48262,48263,48264,48298,48266,48267,47616,44177,48268-E Preliminary Statements ..................................48269,48064,48075,41723,47619,48076,48077-E Rules ................................................................................................ 48066,48048,48034-E Maps, Contracts and Deviations ................................................................................37960-E Sample Forms .........................................................47207,37631,47208,47620, 37632,47210, ........................................................................... 47211,47621,47213,47622,47214,36059-E (T) (T) (Continued) Advice Decision 6004-E-D Issued by Robert S. Kenney Vice President, Regulatory Affairs Submitted Effective Resolution January 14, 2021 January 1, 2021
- Page 8 -

Revised Cancelling Revised U 39 Cal. P.U.C. Sheet No. Cal. P.U.C. Sheet No. 48298-E 48265-E San Francisco, California ELECTRIC TABLE OF CONTENTS TITLE OF SHEET SCHEDULE Sheet 5 CAL P.U.C. SHEET NO. Rate Schedules Lighting Rates LS-1 LS-2 LS-3 OL-1 TC-1 Pacific Gas and Electric Company-Owned Street and Highway Lighting ................... 45482,48227, ..................................................... 45484, 48228,48229,48230,48031,48232,48233,45485,45486, ........................................ 45487,45488,30282,30283,45489,45490,45491,45492,45493,48234-E Customer-Owned Street and Highway Lighting.......................... 33883,48235,48236,48237,48238, ................. 48239,48240,29870,48296,33887,29873,29874,29875,29876,29877,46584,48242-E (T) Customer-Owned Street and Highway Lighting Electrolier Meter Rate ............................................ ..................................................................................................48243,24553,26984,26985,48244-E Outdoor Area Lighting Service................... 48245,48246,48247,48248,48249,48250,43266,43267, ................................................................................................................................... 43268,48251-E Traffic Control Service........................................................................... 48259,24558,26988,48260-E (Continued) Advice Decision 6004-E-D Issued by Robert S. Kenney Vice President, Regulatory Affairs Submitted Effective Resolution January 14, 2021 January 1, 2021
- Page 9 -

PG&E Gas and Electric Advice Submittal List General Order 96-B, Section IV AT&T Albion Power Company East Bay Community Energy Ellison Schneider & Harris LLP Energy Management Service Alta Power Group, LLC Anderson & Poole Engineers and Scientists of California Atlas ReFuel BART Barkovich & Yap, Inc. California Cotton Ginners & Growers Assn California Energy Commission California Hub for Energy Efficiency Financing California Alternative Energy and Advanced Transportation Financing Authority California Public Utilities Commission Calpine Cameron-Daniel, P.C. Casner, Steve Cenergy Power Center for Biological Diversity Chevron Pipeline and Power City of Palo Alto City of San Jose Clean Power Research Coast Economic Consulting Commercial Energy Crossborder Energy Crown Road Energy, LLC Davis Wright Tremaine LLP Day Carter Murphy Dept of General Services Don Pickett & Associates, Inc. Douglass & Liddell GenOn Energy, Inc. Goodin, MacBride, Squeri, Schlotz & Ritchie Green Power Institute Hanna & Morton ICF IGS Energy International Power Technology Intestate Gas Services, Inc. Kelly Group Ken Bohn Consulting Keyes & Fox LLP Leviton Manufacturing Co., Inc. Los Angeles County Integrated Waste Management Task Force MRW & Associates Manatt Phelps Phillips Marin Energy Authority McKenzie & Associates Modesto Irrigation District NLine Energy, Inc. NRG Solar Office of Ratepayer Advocates OnGrid Solar Pacific Gas and Electric Company Peninsula Clean Energy Pioneer Community Energy Redwood Coast Energy Authority Regulatory & Cogeneration Service, Inc. SCD Energy Solutions San Diego Gas & Electric Company SPURR San Francisco Water Power and Sewer Sempra Utilities Sierra Telephone Company, Inc. Southern California Edison Company Southern California Gas Company Spark Energy Sun Light & Power Sunshine Design Tecogen, Inc. TerraVerde Renewable Partners Tiger Natural Gas, Inc. TransCanada Utility Cost Management Utility Power Solutions Water and Energy Consulting Wellhead Electric Company Western Manufactured Housing Communities Association (WMA) Yep Energy