Details for: PGE AL 4385-G_6091-E.pdf


Click on the image for full size preview

Document data

Erik Jacobson
Director
Regulatory Relations

Pacific Gas and Electric Company
77 Beale St., Mail Code B13U
P.O. Box 770000
San Francisco, CA 94177
Fax: 415-973-3582

February 19, 2021

Advice 4385-G/6091-E
(Pacific Gas and Electric Company ID U 39 M)

Public Utilities Commission of the State of California
Subject:

Establish the Regionalization Plan Memorandum Account (RPMA) to
Record Costs Incurred Implementing regionalization as proposed in
Application (A.) 20-06-011.

Purpose
This advice letter establishes a new memorandum account to track incremental costs
PG&E incurs in connection with the development and implementation of regionalization ,
as proposed in A.20-06-011 and as may be modified by the Commission. This advice
letter is submitted pursuant to the October 2, 2020 Assigned Commissioner Scoping
Memo and Ruling (Scoping Memo) authorizing PG&E’s request to establish the RPMA
effective as of June 30, 2020.
Background
As required by Decision (D.) 20-05-053, on June 30, 2020, PG&E filed A.20-06-011
requesting approval of its Regionalization Proposal. In its Application, PG&E requested
authorization to establish the RPMA effective as of the filing date of its Application to
record incremental costs PG&E incurs in connection with development and
implementation of regionalization.1
On October 2, 2020, the Commission issued the Assigned Commissioner Scoping Memo
and Ruling, which ruled that PG&E was “authorized to establish a memorandum account
to track the costs of regionalization, effective June 30, 2020.”2

1
2

Application 20-05-053, p. 14.
Assigned Commissioner Scoping Memo and Ruling, p. 10, paragraph 2.





- Page 1 -

Advice 4385-G/6091-E -2- February 19, 2021 Tariff Revisions In compliance with the Scoping Memo, PG&E proposes to establish the following memorandum account: • • Gas Preliminary Statement Part FN, Regional Plan Memorandum Account – Gas (RPMA-G) Electric Preliminary Statement Part IS, Regional Plan Memorandum Account – Electric (RPMA-E) The Regional Plan Memorandum Accounts will track and record the incremental costs incurred related to developing and implementing PG&E’s Regionalization Plan in accordance with the Commission’s directives. Such costs may include amounts related to facilities and real estate, information technology, compensation of new regional officers and other personnel, and other reasonable expenditures to implement the regional restructuring required by the Commission. Protests ***Due to the COVID-19 pandemic and the shelter at home orders, PG&E is currently unable to receive protests or comments to this advice letter via U.S. mail or fax. Please submit protests or comments to this advice letter to EDTariffUnit@cpuc.ca.gov and PGETariffs@pge.com*** Anyone wishing to protest this submittal may do so by letter sent via U.S. mail, facsimile or E-mail, no later than March 11, 2021, which is 20 days after the date of this submittal. Protests must be submitted to: CPUC Energy Division ED Tariff Unit 505 Van Ness Avenue, 4th Floor San Francisco, California 94102 Facsimile: (415) 703-2200 E-mail: EDTariffUnit@cpuc.ca.gov Copies of protests also should be mailed to the attention of the Director, Energy Division, Room 4004, at the address shown above. The protest shall also be sent to PG&E either via E-mail or U.S. mail (and by facsimile, if possible) at the address shown below on the same date it is mailed or delivered to the Commission:
- Page 2 -

Advice 4385-G/6091-E -3- February 19, 2021 Erik Jacobson Director, Regulatory Relations c/o Megan Lawson Pacific Gas and Electric Company 77 Beale Street, Mail Code B13U P.O. Box 770000 San Francisco, California 94177 Facsimile: (415) 973-3582 E-mail: PGETariffs@pge.com Any person (including individuals, groups, or organizations) may protest or respond to an advice letter (General Order 96-B, Section 7.4). The protest shall contain the following information: specification of the advice letter protested; grounds for the protest; supporting factual information or legal argument; name, telephone number, postal address, and (where appropriate) e-mail address of the protestant; and statement that the protest was sent to the utility no later than the day on which the protest was submitted to the reviewing Industry Division (General Order 96-B, Section 3.11). Effective Date Pursuant to General Order (GO) 96-B, Rule 5.1, and the Scoping Memo, this advice letter is submitted with a Tier 1 designation. PG&E requests that this Tier 1 advice submittal become effective upon the date of submittal with an effective date of June 30, 2020. Notice In accordance with General Order 96-B, Section IV, a copy of this advice letter is being sent electronically and via U.S. mail to parties shown on the attached list and parties on the following service list: A.20-06-011. Address changes to the General Order 96-B service list should be directed to PG&E at email address PGETariffs@pge.com. For changes to any other service list, please contact the Commission’s Process Office at (415) 703-2021 or at Process_Office@cpuc.ca.gov. Send all electronic approvals to PGETariffs@pge.com. Advice letter submittals can also be accessed electronically at: http://www.pge.com/tariffs/. /S/ Erik Jacobson Director, Regulatory Relations Attachments cc: Service List A.20-06-011
- Page 3 -

ADVICE LETTER SUMMARY ENERGY UTILITY MUST BE COMPLETED BY UTILITY (Attach additional pages as needed) Company name/CPUC Utility No.: Pacific Gas and Electric Company (ID U39M) Utility type: ELC GAS PLC HEAT ELC = Electric PLC = Pipeline WATER Contact Person: Kimberly Loo Phone #: (415)973-4587 E-mail: PGETariffs@pge.com E-mail Disposition Notice to: KELM@pge.com EXPLANATION OF UTILITY TYPE GAS = Gas WATER = Water HEAT = Heat (Date Submitted / Received Stamp by CPUC) Tier Designation: 1 Advice Letter (AL) #: 4385-G/6091-E Subject of AL: Establish the Regionalization Plan Memorandum Account (RPMA) to Record Costs Incurred Implementing regionalization as proposed in Application (A.) 20-06-011. Keywords (choose from CPUC listing): Compliance, Memorandum Account AL Type: Monthly Quarterly Annual One-Time Other: If AL submitted in compliance with a Commission order, indicate relevant Decision/Resolution #: Does AL replace a withdrawn or rejected AL? If so, identify the prior AL: No Summarize differences between the AL and the prior withdrawn or rejected AL: Confidential treatment requested? Yes No If yes, specification of confidential information: Confidential information will be made available to appropriate parties who execute a nondisclosure agreement. Name and contact information to request nondisclosure agreement/ access to confidential information: Resolution required? Yes No Requested effective date: 6/30/20 No. of tariff sheets: 7 Estimated system annual revenue effect (%): N/A Estimated system average rate effect (%): N/A When rates are affected by AL, include attachment in AL showing average rate effects on customer classes (residential, small commercial, large C/I, agricultural, lighting). Tariff schedules affected: See Attachment 1 Service affected and changes proposed1: N/A Pending advice letters that revise the same tariff sheets: N/A 1 Discuss in AL if more space is needed. Clear Form
- Page 4 -

Protests and all other correspondence regarding this AL are due no later than 20 days after the date of this submittal, unless otherwise authorized by the Commission, and shall be sent to: CPUC, Energy Division Attention: Tariff Unit 505 Van Ness Avenue San Francisco, CA 94102 Email: EDTariffUnit@cpuc.ca.gov Name: Erik Jacobson, c/o Megan Lawson Title: Director, Regulatory Relations Utility Name: Pacific Gas and Electric Company Address: 77 Beale Street, Mail Code B13U City: San Francisco, CA 94177 Zip: 94177 State: California Telephone (xxx) xxx-xxxx: (415)973-2093 Facsimile (xxx) xxx-xxxx: (415)973-3582 Email: PGETariffs@pge.com Name: Title: Utility Name: Address: City: State: District of Columbia Telephone (xxx) xxx-xxxx: Facsimile (xxx) xxx-xxxx: Email: Zip: Clear Form
- Page 5 -

Attachment 1 Advice 4385-G Cal P.U.C. Sheet No. Title of Sheet Cancelling Cal P.U.C. Sheet No. 36926-G GAS PRELIMINARY STATEMENT PART FN REGIONAL PLAN MEMORANDUM ACCOUNT - GAS (RPMA-G) Sheet 1 36927-G GAS TABLE OF CONTENTS Sheet 1 36924-G 36928-G GAS TABLE OF CONTENTS Sheet 6 36925-G 36929-G GAS TABLE OF CONTENTS Sheet 7 35659-G Page 1 of 1
- Page 6 -

Original U 39 Cal. P.U.C. Sheet No. San Francisco, California GAS PRELIMINARY STATEMENT PART FN REGIONAL PLAN MEMORANDUM ACCOUNT - GAS (RPMA-G) FN. 36926-G Sheet 1 REGIONAL PLAN MEMORANDUM ACCOUNT - GAS (RPMA-G) (N) 1. PURPOSE: The purpose of the Regional Plan Memorandum Account (RPMA) is to track and record the incremental costs incurred related to developing and implementing PG&E’s Regionalization Plan in accordance with directives of the California Public Utilities Commission. Such costs may include amounts related to facilities and real estate, inf ormation technology, compensation of new regional officers and other personnel, and other reasonable expenditures to implement regional restructuring. The RPMA will not include costs recorded and recovered in another account. 2. APPLICABILITY: The RPMA shall apply to all customer classes, except for those specifically excluded by the Commission. 3. REVISION DATES: Disposition of the balance in the account will be through a General Rate Case (GRC) or other application as authorized by the Commission. 4. RATES: The RPMA does not have a separate rate component. 5. ACCOUNTING PROCEDURE: The f ollowing entries will be made each month, or as applicable: a) A debit entry equal to incremental costs of regionalization including but not limited to amounts related to facilities and real estate, information technology, and compensation of regional personnel; b) A debit or credit entry equal to the capital revenue requirement associated with the actual capital expenditures incurred. Capital-related revenue requirements include depreciation expense, return on rate base at the authorized cost of capital, federal and state income taxes, and property taxes, associated with the capital asset additions; c) An entry to record the transfer of amounts to or from other accounts as approved by the Commission; and d) An entry equal to interest on the average balance in the account at the beginning of the month and the balance after the above entries, at a rate equal to one-twelfth of the interest rate on three-month Commercial Paper for the previous month, as reported in the Federal Reserve Statistical Release, H.15 or its successor. Advice Decision 4385-G Issued by Robert S. Kenney Vice President, Regulatory Affairs (N) (N) Submitted Effective Resolution (N) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | (N) February 19, 2021 June 30, 2020
- Page 7 -

Cancelling U 39 Revised Revised Cal. P.U.C. Sheet No. Cal. P.U.C. Sheet No. 36927-G 36924-G San Francisco, California GAS TABLE OF CONTENTS Sheet 1 CAL P.U.C. SHEET NO. TITLE OF SHEET Title Page ........................................................................................................................................... 36927-G Rate Schedules ....................................................................................................................... 36916,36742-G Preliminary Statements ........................................................................................................... 36743,36670-G Preliminary Statements, Rules ........................................................................................................... 36928-G Rules, Maps, Contracts and Deviations .............................................................................................. 36929-G Sample Forms ........................................................................................ 36186,36187,36188,36189,36190-G (T) (T) (T) (Continued) Advice Decision 4385-G Issued by Robert S. Kenney Vice President, Regulatory Affairs Submitted Effective Resolution February 19, 2021 June 30, 2020
- Page 8 -

Revised Cancelling Revised U 39 Cal. P.U.C. Sheet No. Cal. P.U.C. Sheet No. San Francisco, California GAS TABLE OF CONTENTS PART 36928-G 36925-G Sheet 6 CAL P.U.C. SHEET NO. TITLE OF SHEET Preliminary Statements Part Part Part Part Part Part Part Part Part Part Part DO DP DQ DR DS DT DU DZ EA EB EC Part Part Part Part Part Part Part Part EE EF EG EH FC FD FI FN RULE Hydrostatic Pipeline Testing Memorandum Account ............................................................. 32805-G Transmission Integrity Management Program Memorandum Account................................. 33476-G Engineering Critical Assessment Balancing Account (ECABA) ............................................ 32809-G Hydrostatic Station Testing Memorandum Account (HSTMA) .............................................. 33084-G Work Required by Others Balancing Account (WROBA) ...................................................... 33477-G Critical Document Program Memorandum Account (CDPMA) ............................................. 32812-G Z-Factor Memorandum Account (ZFMA-G) ............................................................... 33478,33479-G New Environmental Regulations Balancing Account (NERBA) ................................ 34675,33812-G Natural Gas Leak Abatement Program Balancing Account (NGLAPBA) ............................. 33695-G Natural Gas Leak Abatement Prog ram Memorandum Account (NGLAPMA)...................... 33600-G Emergency Consumer Protections Memorandum Account – Gas (ECPMA-G) ...........34677,36265, ....................................................................................................................................... 36922,36510-G Wildfire Expense Memorandum Account (WEMA-G) ........................................................... 34367-G Statewide Energy Efficiency Balancing Account – Gas (SWEEBA-G) .......... 36226,36227,36228-G Dairy Biomethane Pilots Balancing Account (DBPBA) ......................................................... 34715-G Dairy Biomethane Pilots Memorandum Account (DBPMA) ................................................. 34716-G Rate Base Adjustment Memorandum Account (RBAMA) .................................................... 35422-G California Consumer Privacy Act Memorandum Account – Gas (CCPAMA-G) ................. 35320-G Climate Adaptation Vulnerability Assessment Memorandum Account-Gas (CAVAMA-G) . 36253-G Regional Plan Memorandum Account – (RPMA-G) ............................................................. 36926-G (N) TITLE OF SHEET Rules Rule 01 Rule 02 Rule 03 Rule 04 Rule 05 Rule 06 Rule 07 Rule 08 Rule 09 Rule 10 Rule 11 Rule 12 Rule 13 Rule 14 Rule 15 Rule 16 Rule 17 Rule 17.1 Rule 17.2 Definitions ................................................... 31083,26782,33639,31560,31561,35243,34516,35021*, .............................. 36923,35130,34467,34468,34469,34470,34471,34472,34473,34474,34475-G Description of Service ......................................................23062,23063,23064,23065,23066,33824-G Application for Service ..................................................................................................27248,27249-G Contracts...................................................................................................................................17051-G Special Information Required on Forms ...........................................................30088,32872,32873-G Establishment and Reestablishment of Credit..................................................22126,30687,34524-G Deposits .........................................................................................................................31330,28655-G Notices ......................................................................................... 31924,17580,31925,30689,31926-G Rendering and Payment of Bills .................................................... 31914,34525,31381,33305,33507, ..........................................................................................................................27345,31167,34972-G Disputed Bills ....................................................................................................18214,18215, 18216-G Discontinuance and Restoration of Service....................... 34867,36307,34052,34053,33494,33878, .............................. 34516,34678,34465,34632,34467,34470,34471,34472,34473,34474,34475-G Rates and Optional Rates................................................18229,27253,24132,21981,21982,34520-G Temporary Service...................................................................................................................22832-G Capacity Allocation and Constraint of Natural Gas Service.....................18231,18232,18233,18234, ............................................. 18235,30690,30691,30692,30693,30694,30695,30696,30697,30698, ..........................................28283,30699,30700,30701,30702,29787,28289,28290,30703,28292-G Gas Main Extensions ....................... 21543,18802-18803,32408,20350,29271,31168,26827,21544, .................................................................21545,22376,22377,22378,22379,26828,26829,18814-G Gas Service Extensions ................... 21546,18816,34880,17161,18817,18818,18819,18820,18821, ............................................................................ 18822,29273,18824,18825,17737,18826,18827-G Meter Tests and Adjustment of Bills for Meter Error .................... 14450,28656,28764,28770,28771, ..........................................................................................................................28772,28773,28774-G Adjustment of Bills for Billing Error ....................................................................22936,28657,29274-G Adjustment of Bills for Unauthorized Use .........................................................22937,14460,14461-G (L) (L) (Continued) Advice Decision 4385-G Issued by Robert S. Kenney Vice President, Regulatory Affairs Submitted Effective Resolution February 19, 2021 June 30, 2020
- Page 9 -

Cancelling U 39 Revised Revised Cal. P.U.C. Sheet No. Cal. P.U.C. Sheet No. San Francisco, California GAS TABLE OF CONTENTS RULE 36929-G 35659-G Sheet 7 CAL P.U.C. SHEET NO. TITLE OF SHEET Rules Rule 18 Rule 19 Rule 19.1 Rule 19.2 Rule 19.3 Rule 19.4 Rule 21 Rule 23 Rule 25 Rule 26 Rule 27 Rule 27.1 Rule 28 Supply to Separate Premises and Submetering of Gas ............................. 22790,17796,13401-G Medical Baseline Quantities ....................................................................... 21119,31932,21121-G California Alternate Rates for Energy for Individual Customers and Submetered Tenants of Master-Metered Customers .......................................................... 34521,34220,30445,28210-G California Alternate Rates for Energy for Nonprofit Group-Living Facilities .................................... .......................................................................................... 32051,34221,17035,31217,34522-G California Alternate Rates for Energy for Qualified Agricultural Employee Housing Facilities ........ ..................................................................................................... 32053,34222,31219,34523-G California Alternate Rates for Energy for Qualified Food Bank Facilities ......................... 35059-G Transportation of Natural Gas .................27591,35234,35235,31872,32557,32558,32559,32560, .............................................................32561,32562,32563,32564,32565,31955,29231,33640, ............................................................31957,35069,35070,35071,35072, 35073,35074,35075, .............................................. 35076, 35077,35078,35079,35080,35081,35082,35083,35084-G Gas Aggregation Service for Core Transport Customers ................... 30871,29675,26664,18265, ................. 30872,26666,24825,24826,24827,29677,29678,30873,30874,30875,29681,29682, .............. 30876,30877,30878,30879,30880,30881,30882,30883,30884,30885,30886,30887-G Gas Services-Customer Creditworthiness and Payment Terms ................... 28816,28817,28818, .................................... 28819.28820.28821.28822.28823.28824.28825.28826.28827.28828-G Standards of Conduct and Procedures Related to Transactions with Intracompany Departments, Reports of Negotiated Transactions, and Complaint Procedures . 29688,29689,29690,31933-G Privacy and Security Protection for Energy Usage ................... 30095,30096,30097,30098,30099 .............. 30100,30101,30102,30103,30104,30105,30106,30107,30108,30109,30110,30111-G Access to Energy Usage and Usage-Related Data While Protecting Privacy of Personal Data .... .......................................................................................... 31387,31388,31389,31390,31391-G Mobilehome Park Utility Upgrade Program ........................................ 34941,21773,31774,31775, ..................................................................................................... 31776-31777,32133,32134-G (L) (L) Maps, Contracts and Deviations SERVICE AREA MAPS: Gas Service Area Map ..................................................................................................... 31641-G LIST OF CONTRACTS AND DEVIATIONS: ................. 20211,13247,13248,28466,17112,22437,29938,35657,13254,14426,13808,35193, .............. 20390,16287,29333,29053,29334,14428,13263,14365,32879,35654,16264,13267-G (Continued) Advice Decision 4385-G Issued by Robert S. Kenney Vice President, Regulatory Affairs Submitted Effective Resolution February 19, 2021 June 30, 2020
- Page 10 -

Attachment 1 Advice 6091-E Cal P.U.C. Sheet No. Title of Sheet Cancelling Cal P.U.C. Sheet No. 48732-E ELECTRIC PRELIMINARY STATEMENT PART IS REGIONAL PLAN MEMORANDUM ACCOUNT - ELECTRIC (RPMAE) Sheet 1 48733-E ELECTRIC TABLE OF CONTENTS Sheet 1 48729-E 48734-E ELECTRIC TABLE OF CONTENTS Sheet 17 48730-E Page 1 of 1
- Page 11 -

Original U 39 Cal. P.U.C. Sheet No. San Francisco, California ELECTRIC PRELIMINARY STATEMENT PART IS REGIONAL PLAN MEMORANDUM ACCOUNT - ELECTRIC (RPMA-E) IS. 48732-E Sheet 1 REGIONAL PLAN MEMORANDUM ACCOUNT - ELECTRIC (RPMA-E) (N) 1. PURPOSE: The purpose of the Regional Plan Memorandum Account (RPMA) is to track and record the incremental costs incurred related to developing and implementing PG&E’s Regionalization Plan in accordance with directives of the California Public Utilities Commission. Such costs may include amounts related to facilities and real estate, information technology, compensation of new regional officers and other personnel, and other reasonable expenditures to implement regional restructuring. The RPMA will not include costs recorded and recovered in another account. 2. APPLICABILITY: The RPMA shall apply to all customer classes, except for those specifically excluded by the Commission. 3. REVISION DATES: Disposition of the balance in the account will be through a General Rate Case (GRC) or other application as authorized by the Commission. 4. RATES: The RPMA does not have a separate rate component. 5. ACCOUNTING PROCEDURE: The following entries will be made each month, or as applicable: a) A debit entry equal to incremental costs of regionalization; b) A debit or credit entry equal to the capital revenue requirement associated with the actual capital expenditures incurred. Capital-related revenue requirements include depreciation expense, return on rate base at the authorized cost of capital, federal and state income taxes, and property taxes, associated with the capital asset additions; c) An entry to record the transfer of amounts to or from other accounts as approved by the Commission; and d) An entry equal to interest on the average balance in the account at the beginning of the month and the balance after the above entries, at a rate equal to one-twelfth of the interest rate on three-month Commercial Paper for the previous month, as reported in the Federal Reserve Statistical Release, H.15 or its successor. Advice Decision 6091-E Issued by Robert S. Kenney Vice President, Regulatory Affairs Submitted Effective Resolution (N) (N) (N) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | (N) February 19, 2021 June 30, 2020
- Page 12 -

Cancelling U 39 Revised Revised Cal. P.U.C. Sheet No. Cal. P.U.C. Sheet No. 48733-E 48729-E San Francisco, California ELECTRIC TABLE OF CONTENTS Sheet 1 TABLE OF CONTENTS SCHEDULE CAL P.U.C. SHEET NO. TITLE OF SHEET Title Page ............................................................................................................................... 48733-E Rate Schedules ......................................... 45400,46963,46865,45403,48538,48539,43935,44177-E Preliminary Statements .......................... 45406,44687,42856*,48540,41723,48516,48082,48734 -E Rules ................................................................................................................ 48731,48375,48541-E Maps, Contracts and Deviations ............................................................................................ 37960-E Sample Forms .... 40925*,37631,45743,41573*, 37632,41152*,41153,37769,44035,42829,37169-E (T) | (T) (Continued) Advice Decision 6091-E Issued by Robert S. Kenney Vice President, Regulatory Affairs Submitted Effective Resolution February 19, 2021 June 30, 2020
- Page 13 -

Revised Cancelling Revised U 39 Cal. P.U.C. Sheet No. Cal. P.U.C. Sheet No. 48734-E 48730-E San Francisco, California ELECTRIC TABLE OF CONTENTS PART Sheet 17 CAL P.U.C. SHEET NO. TITLE OF SHEET Preliminary Statements (Cont’d) Part GA Part GB Part GC Part GD Part GE Part GF Part GH Part GI Part GJ Part GK Part GL Part GM Part GN Part GO Part GP Part GQ Part GR Part GS Greenhouse Gas Expense Memorandum Account.................................................. 32419,32420-E Greenhouse Gas Revenue Balancing Account ........................................................ 35256,40560-E California Energy Systems for the 21 st Century Balancing Account ...................................40561-E Smart Grid Pilot Deployment Project Balancing Account........................... 32540,32541, 32542-E Statewide Marketing, Education and Outreach Expenditure Balancing Account .............37728-E Customer Data Access Balancing Account – Electric...........................................................33136-E Mobile Home Park Balancing Account - Electric ...................................................... 41091,41092-E Energy Data Center Memorandum Account – Electric.........................................................33940-E Major Emergency Balancing Account (MEBA) ......................................................................40563-E SmartMeterTM Opt-Out Program Balancing Account - Electric (SOPBA-E)35625,35626,35627-E Hydro Licensing Balancing Account (HLBA) ..........................................................................48051-E Nuclear Regulatory Commission Rulemaking Balancing Account (NRCRBA) .................48052-E San Francisco Incandescent Streetlight Replacement Account..........................................34364-E Disconnection Memorandum Account - Electric (DMA-E)....................................................34604-E Green Tariff Shared Renewables Memorandum Account (GTSRMA) ..... 40566,40567, 40567-E Energy Efficiency Financing Balancing Account – Electric (EEFMA-E).... 35292,35293,35294-E Green Tariff Shared Renewables Balancing Account (GTSRBA).............. 40569,40570,35377-E Residential Rate Reform Memorandum Account (RRRMA) ................................... 48053,48054-E Part GU Part GV Part GY Part GZ Part HA Part HB Part HC Part HD Part HE Part HF Part HG Z-Factor Memorandum Account (ZFMA-E) ............................................................................48055-E Distribution Interconnection Memorandum Account (DIMA)................................................40575-E Electric Vehicle Program Balancing Account (EVPBA) ........................................................40576-E Distributed Energy Resources Distribution Deferral Account .................... 43656,43657,43658-E Avoided Cost Calculator Memorandum Account...................................................................40000-E Distribution Resources Plan Demonstration Balancing Account.........................................40577-E Rule 20A Balancing Account ....................................................................................................41736-E Tax Memorandum Account (TMA-E).......................................................................................41088-E Executive Compensation Memorandum Account (ECMA-E) ................................. 40699,40700-E Distribution Resources Plan Tools Memorandum Account (DRPTMA) ................ 42139,42140-E Emergency Consumer Protections Memorandum Account - Electric (WCPMA-E)......................... ............................................................................................................................. 43007,47376,48727-E Transportation Electrification Balancing Account (TEBA)……44688,44689,44690,44691, ................................................................................................................. 42579,42580,42581,44692-E Solar On Multifamily Affordable Housing Balancing Account (SOMAHBA).......................41781-E Diablo Canyon Retirement Balancing Account ....................................................... 42161, 43668-E Wildfire Expense Memorandum Account (WEMA-E) ............................................. 42604, 42605-E Public Policy Charge Balancing Account (PPCBA) ......................... 44715,47856,47857,46126-E Statewide Energy Efficiency Balancing Account – E (SWEEBA-E) .......... 47069,47070,47071-E Fire Risk Mitigation Memorandum Account (FRMMA) ........................................................48070-E Net Energy Metering (NEM) Balancing Account (NEMBA)..................................................43317-E Portfolio Allocation Balancing Account (PABA) .......46729,47858,48071,47860,47861,47862-E Officer Compensation Memorandum Account (OCMA-E)....................................... 43629,43630-E San Joaquin Valley Disadvantaged Communities Pilot Balancing Account ......................44053-E Wildfire Plan Memorandum Account (WPMA) ......................................................................48072-E General Rate Case Memorandum Account – Electric (GRCMA-E) ......................... 45750*,45751*-E Part HH Part HI Part HK Part HL Part HM Part HO Part HQ Part HR Part HS Part HT Part HU Part HX Part IB Part II Climate Adaptation Vulnerability Assessment Memorandum Account - Electric (CAVAMA-E) .................................................................................................................................................... 47350*-E Part IJ Part IS BioMAT Non-bypassable Charge Balancing Account (BNBCBA) .............................. 47633,47634-E Regional Plan Memorandum Account – Electric (RPMA-E) .....................................................48732-E (N) (Continued) Advice Decision 6091-E Issued by Robert S. Kenney Vice President, Regulatory Affairs Submitted Effective Resolution February 19, 2021 June 30, 2020
- Page 14 -

PG&E Gas and Electric Advice Submittal List General Order 96-B, Section IV AT&T Albion Power Company East Bay Community Energy Ellison Schneider & Harris LLP Energy Management Service Alta Power Group, LLC Anderson & Poole Engineers and Scientists of California Atlas ReFuel BART Barkovich & Yap, Inc. California Cotton Ginners & Growers Assn California Energy Commission California Hub for Energy Efficiency Financing California Alternative Energy and Advanced Transportation Financing Authority California Public Utilities Commission Calpine Cameron-Daniel, P.C. Casner, Steve Cenergy Power Center for Biological Diversity Chevron Pipeline and Power City of Palo Alto City of San Jose Clean Power Research Coast Economic Consulting Commercial Energy Crossborder Energy Crown Road Energy, LLC Davis Wright Tremaine LLP Day Carter Murphy Dept of General Services Don Pickett & Associates, Inc. Douglass & Liddell GenOn Energy, Inc. Goodin, MacBride, Squeri, Schlotz & Ritchie Green Power Institute Hanna & Morton ICF IGS Energy International Power Technology Intestate Gas Services, Inc. Kelly Group Ken Bohn Consulting Keyes & Fox LLP Leviton Manufacturing Co., Inc. Los Angeles County Integrated Waste Management Task Force MRW & Associates Manatt Phelps Phillips Marin Energy Authority McKenzie & Associates Modesto Irrigation District NLine Energy, Inc. NRG Solar Office of Ratepayer Advocates OnGrid Solar Pacific Gas and Electric Company Peninsula Clean Energy Pioneer Community Energy Redwood Coast Energy Authority Regulatory & Cogeneration Service, Inc. SCD Energy Solutions San Diego Gas & Electric Company SPURR San Francisco Water Power and Sewer Sempra Utilities Sierra Telephone Company, Inc. Southern California Edison Company Southern California Gas Company Spark Energy Sun Light & Power Sunshine Design Tecogen, Inc. TerraVerde Renewable Partners Tiger Natural Gas, Inc. TransCanada Utility Cost Management Utility Power Solutions Water and Energy Consulting Wellhead Electric Company Western Manufactured Housing Communities Association (WMA) Yep Energy