April 1, 2021

Advice No. 5793
(U 904G)
Public Utilities Commission of the State of California
Subject: 2020 Annual Report for Relocation Work Performed for the California
High-Speed Rail Authority (CHSRA) in Compliance with Resolution G3498
Purpose
In compliance with Commission Resolution (Res.) G-3498, Ordering Paragraph (OP) 4,
Southern California Gas Company (SoCalGas) hereby provides its annual report for
relocation work performed for the CHSRA as summarized in the “Report Summary” and
as shown in Attachment A.
Background
Res. G-3498 ordered SoCalGas, Pacific Gas and Electric Company (PG&E), and
Southern California Edison Company (SCE) to submit annual reports tracking the cost
and status of all relocation work performed for CHSRA on April 1 of every year starting
on April 1, 2017.
The annual reports are to be cumulative, summarizing the status and costs of submittals
and transactions from all years prior to each April 1 submittal, and itemizing all
information-only submittals provided to the Commission. Res. G-3498 ordered
SoCalGas, PG&E and SCE to submit the annual report as a Tier 2 advice letter.
Report Summary
This is the fifth annual report submitted in compliance with Res. G-3498 and
encompasses activity for the years 2015 through 2020.





- Page 1 -

Advice No. 5793 -2- April 1, 2021 During the years covered by the annual report, SoCalGas performed relocation work on behalf of CHSRA in 2020; however, there are no documents of completed land transactions included in this annual report. CHSRA will required the transmittal of completion packages prior to the recording land transactions. There are no costs charged to ratepayers for work related to the CHSRA Project. Protests Anyone may protest this advice letter to the Commission. The protest must state the grounds upon which it is based, including such items as financial and service impact, and should be submitted expeditiously. The protest must be made in writing and received within 20 days of the date of this advice letter, which is April 21, 2020. The address for mailing or delivering a protest to the Commission is: CPUC Energy Division Attn: Tariff Unit 505 Van Ness Avenue San Francisco, CA 94102 A copy of the protest should also be sent via email to the attention of the Energy Division Tariff Unit (EDTariffUnit@cpuc.ca.gov). Due to the COVID-19 pandemic and the shelter at home orders, SoCalGas is currently unable to receive protests or comments to this advice letter via U.S. mail or fax. Please submit protests or comments to this advice letter via e-mail to the addresses shown below on the same date it is mailed or e-mailed to the Commission. Attn: Ray B. Ortiz Tariff Manager - GT14D6 555 West Fifth Street Los Angeles, CA 90013-1011 Facsimile No.: (213) 244-4957 E-Mail: ROrtiz@socalgas.com Attn: Lucy Sarkisyan Regulatory Case Manager - GT14D6 555 West Fifth Street Los Angeles, CA 90013-1011 Facsimile No.: (213) 244-4957 E-Mail: LSarkisyan@socalgas.com Effective Date SoCalGas asserts this advice letter is subject to Energy Division disposition and should be classified as Tier 2 (effective after staff approval) pursuant to General Order (GO) 96-B. It is submitted in accordance with OP 4 of Res. G-3498. Accordingly, SoCalGas respectfully requests that this advice letter be effective on May 1, 2021, which is 30 calendar days after the date submitted.
- Page 2 -

Advice No. 5793 -3- April 1, 2021 Notice A copy of this advice letter is being sent to SoCalGas’ GO 96-B service list and the Commission’s service list in R.13-03-009. Address change requests to the GO 96B service list should be directed via e-mail to Tariffs@socalgas.com or call 213244-2837. For changes to all other service lists, please contact the Commission’s Process Office at 415-703-2021 or via e-mail at Process_Office@cpuc.ca.gov. /s/ Joseph Mock Joseph Mock Director – Regulatory Affairs Attachments
- Page 3 -

ADVICE LETTER SUMMARY ENERGY UTILITY MUST BE COMPLETED BY UTILITY (Attach additional pages as needed) Company name/CPUC Utility No.: Southern California Gas Company (U 904G) Utility type: ELC GAS PLC HEAT ELC = Electric PLC = Pipeline WATER Contact Person: Ray B. Ortiz Phone #: (213) 244-3837 E-mail: ROrtiz@socalgas.com E-mail Disposition Notice to: Tariffs@socalgas.com EXPLANATION OF UTILITY TYPE GAS = Gas WATER = Water HEAT = Heat (Date Submitted / Received Stamp by CPUC) Tier Designation: 2 Advice Letter (AL) #: 5793 Subject of AL: 2020 Annual Report for Relocation Work Performed for the California High-Speed Rail Authority (CHSRA) in Compliance with Resolution G-3498 Keywords (choose from CPUC listing): Compliance AL Type: Monthly Quarterly Annual One-Time Other: If AL submitted in compliance with a Commission order, indicate relevant Decision/Resolution #: Res. G-3498 Does AL replace a withdrawn or rejected AL? If so, identify the prior AL: No Summarize differences between the AL and the prior withdrawn or rejected AL: N/A Confidential treatment requested? Yes No If yes, specification of confidential information: Confidential information will be made available to appropriate parties who execute a nondisclosure agreement. Name and contact information to request nondisclosure agreement/ access to confidential information: Resolution required? Yes No Requested effective date: 5/1/21 No. of tariff sheets: 0 Estimated system annual revenue effect (%): N/A Estimated system average rate effect (%): N/A When rates are affected by AL, include attachment in AL showing average rate effects on customer classes (residential, small commercial, large C/I, agricultural, lighting). Tariff schedules affected: N/A Service affected and changes proposed1: N/A Pending advice letters that revise the same tariff sheets: None 1 Discuss in AL if more space is needed. Clear Form
- Page 4 -

Protests and all other correspondence regarding this AL are due no later than 20 days after the date of this submittal, unless otherwise authorized by the Commission, and shall be sent to: CPUC, Energy Division Attention: Tariff Unit 505 Van Ness Avenue San Francisco, CA 94102 Email: EDTariffUnit@cpuc.ca.gov Name: Ray B. Ortiz Title: Regulatory Tariff Manager Utility Name: Southern California Gas Company Address: 555 West Fifth Street, GT14D6 City: Los Angeles Zip: 90013-1011 State: California Telephone (xxx) xxx-xxxx: (213) 244-3837 Facsimile (xxx) xxx-xxxx: (213) 244-4957 Email: ROrtiz@socalgas.com Name: SoCalGas Tariffs Title: Utility Name: Southern California Gas Company Address: 555 West Fifth Street, GT14D6 City: Los Angeles State: California Zip: 90013-1011 Telephone (xxx) xxx-xxxx: (213) 244-2837 Facsimile (xxx) xxx-xxxx: (213) 244-4957 Email: Tariffs@socalgas.com Clear Form
- Page 5 -

ATTACHMENT A Advice No. 5793 Annual Report Table A-3: SoCalGas Current and Expected Submittals for CHSRA Project Relocation Work Table B-1: Annual Report Table 1: Utility Agreements and Costs to Ratepayers to Date for SCG Utility Relocation for the CHSRA Project Table B-2: Annual Report Table 2: Number and Types of SCG Utility Facilities Relocated to Date by Utility Agreement for the CHSRA Project
- Page 6 -

Table A-3: SoCalGas Current and Expected Submittals for CHSRA Project Relocation Work Item No. Submittal Number/ Type Agreements Signed Submittal Date/ Expected 1 AL 4946 (Tier 3) 12/2014 4/5/2016 SoCalGas relocation work Master Agreement No. 14-27 None identified 2 AL 5115 (Tier 2) N/A 4/3/2017 Annual compliance submittal throughout construction (2015-2016) None identified N/A 3 Information-Only Submission 6/14/2017 Notification that SoCalGas entered into a utility agreement with CHSRA (HSR 14-27, Construction Package 2 and 3) submitted via the Energy Division's compliance report submittal procedure. None identified N/A 4 Information-Only Submission 8/7/2017 9/8/2017 Notification that SoCalGas entered into a utility agreement with CHSRA (HSR 14-27, Construction Package 4) submitted via the Energy Division's compliance report submittal procedure. None identified N/A 5 AL 5277 (Tier 2) N/A 4/2/2018 Annual compliance submittal throughout construction (2015-2017) None identified N/A 6 AL 5448 (Tier 2) N/A 4/2/2019 Annual compliance submittal throughout construction (2015-2018) None identified N/A 7 AL 5612 (Tier 2) N/A 4/1/2020 Annual compliance submittal throughout construction (2015-2019) None identified N/A 8 AL 5793 (Tier 2) 4/1/2021 Annual compliance submittal throughout construction (2015-2020) None identified TBD TBD Information-Only Submission TBD SoCalGas relocation work utility agreements will be Through 2030 submmited via the Energy Division's compliance report submittal procedure. TBD N/A TBD Tier 2 ALs TBD Through 2030 TBD TBD 3/20/2017 Description Annual compliance submittal on April 1 through project completion Key: AL = Advice Letter, CHSRA = California High-Speed Rail Authority, and TBD = To Be Determined CHSRA Funding in Submittal Resolution No. G-3498
- Page 7 -

Table B-1: Annual Report Table 1: Utility Agreements and Costs to Ratepayers to Date for SCG Utility Relocation for the CHSRA Project Item No. 1 2 Submittal HSR Project Agreement Master/ Segment No., Value Utility Submittal (Construction ($M) Agreement Package No.) Date HSR 14-27 HSR 14-27 AL 4946 AL 4946 Overall project planning and CP 2-3 Overall project planning and CP 4 None None Cost to CHSRA ($M) $ 16,778,158 $ 12,021,449 Cost to Ratepayers (credits) ($M)1 None None Cost in Rate Case ($M) (case year)2 None None Completion Property Date (all Transaction property Completion transactions) Status None None Notes N/A For Construction Package 2 and 3 consisting of approximately 60 miles south of Fresno at East American Avenue from the end of Construction Package 1 to onemile north of the Tulare-Kern County line. N/A For the design and construction phase of the HSR Project from one mile north of the Tulare-Kern County line in the County of Tulare to the North to Poplar Avenue in the County of Kern to the south. 1 100% of the costs reported in this annual report have been paid for by CHSRA and there will be no costs borne by ratepayers for any of the work related to the CHSRA Project costs reported in this annual report. All collectible costs under Sections 2(B), 2(E), and 6 of the Master Agreement are considered relocation work (with the exception of betterment, salvage and depreciation cost). 2 SoCalGas has not requested funding in its GRC for HSR. Key: AL = Advice Letter, CHSRA = California High-Speed Rail Authority, CP = Construction Package, HSR = High-Speed Rail, kV = kilovolt, and TBD = to be determined
- Page 8 -

Table B-2: Annual Report Table 2: Number and Types of SCG Utility Facilities Relocated to Date by Utility Agreement for the CHSRA Project Item No. Utility Agreement Total Number of Facilities Relocated Electric Distribution Lines (under 50 kV) Electric Power Lines (50 kV to less than 200kV) Electric Transmission Lines (200 kV and above) 1 2 3 4 5 None None None None None None None None None None N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Gas Gas Telecommunications Distribution Transmission Lines Lines Lines None None None None None Key: CHSRA = California High-Speed Rail Authority, HSR = High-Speed Rail, and kV = kilovolt None None None None None N/A N/A N/A N/A N/A Notes Year 2015 Year 2016 Year 2018 Year 2019 Year 2020
- Page 9 -